Through consultation with the community, we gathered valuable feedback from iwi/hapū and Tauranga Girls’ College.
During consultation, the community told us they’d like:
- more modern and inclusive play equipment suitable for a range of ages
- improved amenities including shade, drinking fountain and seating
- Improve access, paved path and drop-down kerb for accessibility shaded areas and somewhere to study
- a refreshed look and feel that brightens the space and invites more use
- seating and social spaces for parents and caregivers
- Some additional ideas were suggested for the space and the current design has been developed with those ideas in mind.
Using this input, we developed the concept design below.

The playground makeover is scheduled to begin in early March. You may notice temporary fencing and site preparation activity ahead of this date as our contractors get ready for construction. Construction is expected to take 6–8 weeks. The playground will be closed for the duration of the upgrade to ensure everyone’s safety.
We’ll share an opening date once work is underway and timelines are confirmed.
Watch this space!