Construction update September 2026

A major focus over the past two months has been the manufacture and installation of key stormwater infrastructure that will support the future roundabout and surrounding development areas. Contractors JMC Construction started with the installation of the drainage line at the northern end of the site, linking with stormwater Pond C. The first 160 metres of 1800mm pipe are now in the ground.

Next steps: Pipeline installation will continue over the coming months, including placing the remaining two of four bespoke manhole structures that will connect the various pipelines and direct the flow towards the stormwater pond. JMC are also prepping the foundations for the box culverts which will run under Belk Road, with peat excavated from beneath their footprint, and the area being backfilled to design level with pumice.

Closing the existing SH29/Belk Road intersection was planned as part of the Tauriko Enabling Works. The intersection will be permanently closed after a new roundabout connecting Belk Road and Taurikura Drive is built.

The new roundabout is being constructed for Tauranga City Council by developer Element IMF, alongside their Stage 4 development of the Tauriko Business Estate, just south of Belk Road. The roundabout will provide improved access for Belk Road residents and business owners to reach the Tauriko Business Estate, SH29 and SH36.

Construction began on Saturday 15 November 2025, following the opening of the connection of Kaweroa Drive to the new Redwood Lane roundabout, as part of the Tauriko Enabling Works project.

Access during construction

Belk Road is now closed at two points to allow for the new roundabout to be built. An extension to Taihoa Rise, between Kaweroa Drive and Anianiku Place, that connects to Belk Road provides temporary access between Belk Road and Kaweroa Drive during construction. Lower Belk Road access will remain via SH29 at the existing intersection during construction.

Belk Road construction map

To improve safety at the SH29/Belk Road intersection during the construction of the Belk Road/Taurikura Drive roundabout, a 70km/h temporary speed limit is in place.

Permanent closure of Belk Road/SH29 intersection

Once the Belk Road/Taurikura Drive connection is built, the SH29/Belk Road intersection will be closed permanently, and the Taihoa Rise extension will also be closed with all traffic using Taurikura Drive instead.

The planned improvements will ultimately provide a safer and more efficient way for all Belk Road residents and businesses to move around, opening additional routes and journey options.

Post-construction map

Key dates

  • Construction of Taihoa Rise extension

    July 2025 - November 2025
  • Close Belk Road for roundabout construction (at Taihoa Rise extension and lower Belk Road

    15 November 2025
  • Construction of new roundabout and connecting road on Taurikura Drive

    November 2025 - Autumn 2027
  • Permanently close Belk Road at SH29

    Follows

Who's listening

Major Projects
Tauranga City Council

info@tauranga.govt.nz 
07 577 7000

Related project

We're working with NZ Transport Agency Waka Kotahi to deliver key improvements to SH29 in Tauriko, to enable the start of housing development at Tauriko West.

SH29 Tauriko Enabling Works

Neighbourhoods

Find out what other projects are happening in Tauriko.

Tauriko projects

 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand |Terms of use|Privacy statement

Back To Top