This is a vital upgrade to ensure residents have access to quality drinking water, and to ensure the network can better handle population growth and reduce service disruptions.
Network upgrades will take place on Cambridge Road, between St Andrews Drive and La Colina Place, and are expected to be complete by late 2026, weather permitting.
Work is split into two portions with the first on the southern end of Cambridge Road from mid-March – August. The second portion of work will be completed between August – December closer to the reservoir located at La Colina Place.
Regular water supply to properties will not be impacted during construction.
Road closure and detours
Traffic management, including detours, will be used during this project and resident access will be maintained at all times.
Cambridge Road water upgrade phase 1: March 2026 to August 2026
Cambridge Road water upgrade phase one map (991kb pdf)
Cambridge Road water upgrade phase 2: August 2026 to December 2026
Cambridge Road water upgrade phase two map (639kb pdf)